Extraction and benefication of quartz material of Melomais area (Kalevalsky district of the Republic of Karelia)
The project proponent: the Ministry for Economic development of the Republic of Karelia
Chief executive: Mihail Nikolaevich Yurinov
Address: 185028 the Republic of Karelia, Petrozavodsk, Andropov St., 2; telephone (8142) 79-23-00, fax (8142) 78-10-39, E-mail: economy@karelia.ru
Contact person: Alexandr Anatolyevich Amosov, telephone (8142) 79-23-18
The goal of the project: construction of a quarry and a mining and beneficiation complex in Melomais area of quartz rocks.
Project description: exploration of Malomais quartz reef is to be conducted through open pit by cycle process scheme with drilling and blasting and external location of overburden rocks.
Location of the object: Malomais quartz reef is situated in Kalevalsky district, 38 km far from Kostomuksha.
Estimated quartz resources, calculated by P2 category 20 meters in depth, account for 7.2 million tons.
Basic parameters of Malomais quarry of quartz rocks
Taking into account the level of knowledge on the occurrence gradual exploitation is needed:
The first stage involves detailed field appraisal of the quartz reef and incidental pilot mining. The amount of mined rock mass is estimated at the level of 5,000 tons per year, what provides for production of concentrated quartz grit:
- Quartz of deep concentration not less than - 1.53 thousand tons per year,
- Quartz for production of industrial silica – 2.08 thousand tons per year,
- Flint for ceramics – 0.66 thousand tons per year.
Further stages iclude industrial exploration and expanding mined rocks capacities. Construction of following objects, sites and roads is needed:
- a quarry;
- spoil dumps of overburden rocks;
- automobile roads (vehicle access, pit roads);
- industrial site;
- buildings and auxiliary facilities;
- networks and facilities for providing the enterprise with electric energy.
Two variants of ore dressing are possible:
- installation of crushing equipment on the pit,
- crushing shop is inclined in the structure of a preconcentration factory.
If ore is crushed on the pit, stationary crushing equipment with mechanic life more than 5 years is used, or instead of it displaceable crushing screening plants, deployed at industrial site. Crushed ore is collected to a transitory run of mine stockpile, later it is shipped to benefication shop by motor transport.
According to the second variant after scarifying quartz goes to a benefication plant, which consists of two separate shops:
- crushing,
- beneficating.
Enterprise capacity (raw material processing):
1. crushing
5 tons per year
16,4 tons per shift
2,73 t/hour
2. benefication
4,34 tons per year
14,23 tons per shift
2,37 t/hour
Project readiness stage: Laboratory investigations on concentrating of nonconventional types of quartz material of Melomais and other quartz reefs were conducted within “Design of technologies of benefication of nonconventional types of quartz material of Louhsky and Kalevalsky districts for producing high-purity quartz heads: innovative approaches and solutions” (2008) research work. Flow diagrams of quartz material benefication with output of quartz products of different qualities were worked out.
 
Financial indicators of the project and technical-and-economic indicators of the project
Productivity, thousand tons per year Unit of measurement
Indicators
1. Extraction
thousand tons
5
2. Annual output:
 
 
- Quartz material (32-35 ppm)
tons
1530
- Quartz material (70-78 ppm)
tons
2080
- Ceramics, glass
tons
660
3. Value of commercial products for the period
thousand Euro
1290
4. Investment expenditures for the period
thousand Euro
2556
4.1. Capital investments, including
thousand Euro
2400
- extraction complex
thousand Euro
671,43
- benefication complex
thousand Euro
1354,29
- transport and road transport shop
thousand Euro
231,43
- construction of vehicle access
thousand Euro
142,86
4.2. Expenditures on equipment replacement
thousand Euro
120
4.3. Operating assets
thousand Euro
36
5. Cost of price in current prices
 
 
- extraction of 1 ton of quartz
11,54
- benefication of 1 ton of quartz
15,33
6. Maintenance costs for the period
thousand Euro
155,17
7. Expenditure on 1 € of commercial product
0,12
8. Balance-sheet profit for the period
thousand Euro
1134,84
9. Net profit for the period
thousand Euro
851,13
10. Amortization for the period
thousand Euro
46,3
11. NPV
1105,09
12. Profitability index
 
1,95
13. Payback period
years
1,98
14. Commercial viability
%
65,09